Login    

Transitgas, transport capacity offer

Transfers on gas pipelines of northwestern Europe in the second quarter of 2019

tubi.jpgThe details regarding capacity transfer on gas pipelines of northwestern Europe in the second quarter of 2019 are already available. In further, announces ENI, “subletting” transport capacity on firm basis on Transitgas and NW Pipeline System (GRTgaz) is offered from April 1 to July 1, 2019.
The product of quarterly capacity is divided in three lots of 60 MWh/h each: 46 lots on Transitgas between Wallbach and the Gries Pass and 5 lots between Oltingue and the Gries Pass, whereas other 15 lots are offered at the exit point of Oltingue again on Transitgas up to the Gires Passo. A message informs that the offered capacity does not include the respective capacity at the entry point of the Gries Pass.
The relevant actors must register online by January 25 and provide the documentation required for the auction by January 29.

 

Energy Morning is an information service on facts and news on the energy industry. As such, the contents of this service do not directly or indirectly reflect the vision and strategy of Snam on the topics covered.

Page Alert
updated
08 January 2019 - 15:34 CET