Snam uses cookies as part of this site to ensure an excellent browsing experience. This site also uses third-party cookies. The cookies used cannot identify the user. For more information about the cookies used and how to delete them, click here. By continuing to browse this site, you consent to the use of cookies.

ITEN

Storage sites

2016 HIGHLIGHTS

CONCESSIONS 10
STORAGE FIELDS: 5 IN LOMBARDIA, 3 IN EMILIA ROMAGNA AND 1 IN ABRUZZO 9
CONCESSION, NOT CURRENTLY IN USE 1
STRATEGIC STORAGE: THE BILLION M3 OF MAXIMUM CAPACITY MADE AVAILABLE BY STOGIT 4.5
TOTAL STORAGE CAPACITY: BILLION M3 (INCLUDING STRATEGIC STORAGE) 16.7
BILLION M3 GAS VOLUMES MOVED THROUGH THE STORAGE SYSTEM 20

Stogit - Presence

map-stoccaggio

LEGEND

  • STORAGE SITE
  • OPERATING OFFICE
  • REGISTERED OFFICE

Storage system compensate different needs of supply and consumption of gas engendered by seasonality of demand. Snam manages nine storage facilities (Brugherio, Bordolano, Cortemaggiore, Treste Treste, Minerbio, Ripalta, Sabbioncello, Sergnano and Settala), which operates in synergy with the transport and regasification infrastructures of the Company, ensuring energy security of the Country.

The natural gas storage activity compensate different needs between supply and gas consumption. Supply - consisting of imports from overseas and domestic production - has a substantially constant profile throughout the year, while demand for gas is characterized by significant seasonal variability. For example, winter demand is significantly higher than the summer one. As a consequence, natural gas storage plays a primary role for the gas system.

storage capacities         Gas moved

Bordolano

The Bordolano plant operates from 2016: it is a jewel of efficiency, technology, safety and environmental sustainability that contributes to making the Italian storage system even safer.

Natural gas storage is a specialized process, where Snam operates according to strict safety and environmental sustainability criteria.

Stogit storage fields are depleted gas production reservoirs, located at average depths of between 1,000 and 1,500 metres below the surface. Having protected natural gas for centuries, these conformations are in fact suitable for containing new gas that is injected by our technicians.

Injection phase is concentrated between April and October, from November to March gas is withdrawn, processed and returned to shippers through the transport network.

The key element is the gas cushion, defined as the minimum amount of gas that must be present in the reservoir to allow the dispensing of the working gas - present in the storage phase - and counteract the rise of the aquifer without impairing the mining characteristics of the Field.

Storage sites

1
2
3
4
5
6
7
8
9

GAS STORAGE STATION

Treatment plant

Via Mario Pagano
20092 Cinisello Balsamo (MI)

Compression station

Via Mario Pagano
20092 Cinisello Balsamo (MI)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1966
  • 8
  • 1,100 mt.
  • N° 2 "LTS" Lines
  • 10 MSm3/day
     
  • 19,800 Kw

GAS STORAGE STATION

Compression station e di Trattamento

Strada Vicinale Cascina Baialupa
20090 Settala (MI)

Emergency phone number +39 +800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1986
  • 27
  • 5
  • 1,150 mt.
  • n° 8 TEG columns - 5.4 MSm 3/day
  • 43.2 MSm3/day
     
  • 22,800 Kw

GAS STORAGE STATION

Treatment plant

Via Vallarsa, 18
26010 Sergnano (CR)

Compression station

Strada per Capralba
26010 Sergnano (CR)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1965
  • 35
  • 2
  • 1,300 mt.
  • n° 13 TEG columns - 4,5 MSm 3/day
  • 58.5 MSm3/day
     
  • 47,000 Kw

GAS STORAGE STATION

Treatment plant

Strada Statale 591 Km. 45.450
26010 Ripalta Guerina (CR)

Compression station

Strada Statale 591 Km. 44.900
26010 Ripalta Cremasca (CR)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant

     
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1967
  • 35
  • 4
  • 1,400 mt.
  • n° 4 columns - 3 MSm 3/day
    n° 2 TEG columns - 6 MSm 3/day
  • 24 MSm3/day
     
  • 46,660 Kw

GAS STORAGE STATION

Compression station e di Trattamento

Via Cascina Razzina - 26020
Bordolano

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 2015
  • 4
  • 1
  • 1,700 mt.
  • N° 1 "LTS" Line
  • 10 MSm3/day
     
  • 23,300 Kw

GAS STORAGE STATION

Treatment plant

Via Sant'Anna - Fraz. San Martino
29016 Cortemaggiore (PC)

Compression station

Via Tre Case
29016 Cortemaggiore (PC)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
     
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant

     
  • Maximum nominal withdrawal rate
  • Compression station's power
  • Pool "C" 1964 - Pool "A" 1991
  • 27
  • 16
  • 1,500 mt.
  • n° 4 GDE columns - 3 MSm 3/day
    n° 2 CICLO FRIGO lines - 6 MSm 3/day
  • 24 MSm3/day
     
  • 43,800 Kw

GAS STORAGE STATION

Treatment plant

Via Molino Rero
44039 Tresigallo (FE)

Compression station

Strada Comunale Roncodigà - Loc. Rero
44039 Tresigallo (FE)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1985
  • 31
  • 4
  • 1,100 mt.
  • n° 5 TEG columns - 4,5 MSm 3/day
  • 22.5 MSm3/day
     
  • 22,800 Kw

GAS STORAGE STATION

Treatment plant

Via Zena
40061 Minerbio (BO)

Compression station

Via Zena - Loc. Cà Nova
40061 Minerbio (BO)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • 1975
  • 51
  • 5
  • 1,300 mt.
  • n° 14 TEG columns - 4,5 MSm3/day
  • 63 MSm3/day
     
  • 44,600 Kw

GAS STORAGE STATION

Treatment plant

Strada Bufalara - Contrada Montalfano
466051 Cupello (CH)

Compression station

Strada Bufalara - Contrada Montalfano
66051 Cupello (CH)

Emergency phone number +39 800 905058

Characteristics

  • Storage operation start year

     
  • N° active storage wells
  • N° monitoring wells
  • Average wells’ depth
  • Treatment plant
  • Maximum nominal withdrawal rate
  • Compression station's power
  • Pool C2 1982 - Pool BCC1 1991 - Pool DEE0 2011
  • 84
  • 29
  • 1,200 mt.
  • n°6 TEG columns - 12 MSm3/day
  • 72 MSm3/g
     
  • 57,400 Kw

Registered Offices

Piazza Santa Barbara, 7 
20097 San Donato Milanese (Milan) 
Italy 
Ph. +39.02.3703.1

Operational Headquarters

Via Libero Comune, 5 
26013 Crema (Cremona) 
Italy 
Ph. +39.0373.892.1

Page Alert
updated
16 August 2017 - 14:37 CEST