Capacity booking and transactions

Snam Rete Gas communicates the procedures in order to access to Transportation Service through web applications Capacity Portal and PRISMA Platform. The Portals will enable users to digitally manage all capacity booking and transaction processes without any need for letters, faxes, or emails.
The processes managed are all those that come under Chapters 5 and 7 of the Snam Rete Gas Network Code:

  • Capacity booking at the beginning of the Thermal Year; 
  • Capacity booking after the beginning of the Thermal Year;
  • Trades;
  • Transfers.
 

To access the service and request transportation capacity at Entry Points, Exit Points and Redelivery Points, the user shall submit a Transportation Contract on JARVIS application.

 
Access Contracts office (CONT; conferimento@snam.it ;+39 02 370 38300 - key 2) remains at your disposal for any clarification needed.

In order to support the Users on the Capacity Portal use, a help desk service is available whose people are as follows:

Access Contracts office (CONT)
Manager: Alessandro Guido Mora  
Tel. +39 02 370 38300 - key 2
Email:  conferimento @snam.it   

For any issues related to the within day capacity booking process made on the PRISMA platform occured outside the time periods described above, if it is not possible to contact the operators at the above number, it is available the following phone assistance service: 
 

Phone number: +39 02 370 37887 
 


The guarantees to cover the Trasportation Contract should be delivered in original in compliance with the deadline foreseen by Snam Rete Gas Network Code at the following address:

 
Snam Rete Gas S.p.A.
Piazza Santa Barbara, 7
20097 San Donato Milanese (MI)
Italy
c.a. Ufficio CONT 
At the reception in the building INSO 1
 

Subject to the obligation to present the original guarantee, to facilitate the management of the same it is required to send a copy via pec to the address gestione.crediti@pec.snam.it and snamretegas.contratti@pec.snamretegas.it by the issuing institute.
 

Here follows a list of the documentation required to access the Portals, as well as the support material to make the Capacity Portal easier and faster to use. 

 

Only for consultation – not binding


 

  • Best Practices & tips to Access to the Snam Rete Gas Services – NEWS

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E, F and G.

     

    The Contract and the documents in English are only for information purpose; the legal version is the Italian one and must be submitted on JARVIS application: https://jarvis.snam.it/#/home.

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments. This guarantee should be worth 20% of the maximum annual confirmed capacity.

    The template is available in the last version of the NC published here.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

    The template is available in the last version of the NC published here.

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E, F and G.

     

    The Contract and the documents in English are only for information purpose; the legal version is the Italian one and must be submitted on JARVIS application: https://jarvis.snam.it/#/home.

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments. This guarantee should be worth 20% of the maximum annual confirmed capacity.

    The template is available in the last version of the NC published here.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

    The template is available in the last version of the NC published here.

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E, F and G.

    The Contracts and all the annexes are available on JARVIS application: https://jarvis.snam.it/#/home.

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments. This guarantee should be worth 20% of the maximum annual confirmed capacity.

    The template is available in the last version of the NC published here.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

    The template is available in the last version of the NC published here.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

    The template is available in the last version of the NC published here.

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

    The template is available in the last version of the NC published here.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E and F.

    The Contracts and all the annexes are available on JARVIS application: https://jarvis.snam.it/#/home.

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments to be presented by 19 th August 2015. This guarantee should be worth 20% of the maximum annual confirmed capacity transmission and should be issued by an Italian bank institute or an Italian branch/office of a foreign bank.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E and F.

  • 02. Attachment A - Rules on Use of Capacity Portal

    Regulations for the use of the Capacity Portal Service attached to Transportation Contract.

  • 03. Attachment A/1 – Regulations for Use

    Document containing the Regulations for Use, attached to the Rules on Use of the Capacity Portal Service.

  • 04. Attachment B – Authorisation form to get access or to modify access to SRG Portals

    Is the fac-simile form with which is possible to require the authorizations for enabling at the portals provided by Snam Rete Gas.

  • 05. Attachment C

    Facsimile of the substitute declaration of certification attesting to the ownership of the representative powers attached to the Trasportation Contract .

  • 06. Attachment D

    Facsimile of the declaration of ownership an Import Contracts in accordance with the provisions of paragraph 1.1.1 of Chapter 5 of the Network Code of Snam Rete Gas..

  • 07. Attachment E

    Facsimile of the substitute declaration of certification useful to communicate the bank details for the correct execution of the Transportation Contract and of the Network Code.

  • 08. Attachment F

    Facsimile of the substitute declaration of certification useful to communicate the absence of any satellite office in Italy.

  • 09. Declaration of the subjects passive-retailers

    Facsimile of the declaration of the subjects passive-retailers .

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments to be presented by 19 th August 2015. This guarantee should be worth 20% of the maximum annual confirmed capacity transmission and should be issued by an Italian bank institute or an Italian branch/office of a foreign bank.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 19. Late corrections - Notification of succession to another subject

    It is the facsimile of the communication of succession to another subject, in relation to Late Corrections indicated in Chapter 9 Paragraph 4 of the Network Code.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E and F.

  • 02. Attachment A - Rules on Use of Capacity Portal

    Regulations for the use of the Capacity Portal Service attached to Transportation Contract.

  • 03. Attachment A/1 – Regulations for Use

    Document containing the Regulations for Use, attached to the Rules on Use of the Capacity Portal Service.

  • 04. Attachment B – Authorisation form to get access or to modify access to SRG Portals

    Is the fac-simile form with which is possible to require the authorizations for enabling at the portals provided by Snam Rete Gas.

  • 05. Attachment C

    Facsimile of the substitute declaration of certification attesting to the ownership of the representative powers attached to the Trasportation Contract .

  • 06. Attachment D

    Facsimile of the declaration of ownership an Import Contracts in accordance with the provisions of paragraph 1.1.1 of Chapter 5 of the Network Code of Snam Rete Gas..

  • 07. Attachment E

    Facsimile of the substitute declaration of certification useful to communicate the bank details for the correct execution of the Transportation Contract and of the Network Code.

  • 08. Attachment F

    Facsimile of the substitute declaration of certification useful to communicate the absence of any satellite office in Italy.

  • 09. Declaration of the subjects passive-retailers

    Facsimile of the declaration of the subjects passive-retailers .

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information regarding the use of personal data pursuant to articles 12-14 of UE regulation n. 679/2016

    Information concerning the use of personal details as per EU Regulation N° 679/2016, articles 12-14.

  • 12. Application form for new login credentials to the Capacity Portal

    Facsimile of the qualifications request necessary for accessing to Capacity Portal in case of legal representative replacement.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments to be presented by 19 th August 2015. This guarantee should be worth 20% of the maximum annual confirmed capacity transmission and should be issued by an Italian bank institute or an Italian branch/office of a foreign bank.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 19. Late corrections - Notification of succession to another subject

    It is the facsimile of the communication of succession to another subject, in relation to Late Corrections indicated in Chapter 9 Paragraph 4 of the Network Code.

  • 01. Transportation Contract

    Standard text of the Transportation Contract to be signed with Snam Rete Gas S.p.A. at the same time as the signing of Attachments A, B, C, D, E and F.

  • 02. Attachment A - Rules on Use of Capacity Portal

    Regulations for the use of the Capacity Portal Service attached to Transportation Contract.

  • 03. Attachment A/1 – Regulations for Use

    Document containing the Regulations for Use, attached to the Rules on Use of the Capacity Portal Service.

  • 04. Attachment B – Authorisation form to get access or to modify access to SRG Portals

    Is the fac-simile form with which is possible to require the authorizations for enabling at the portals provided by Snam Rete Gas.

  • 05. Attachment C

    Facsimile of the substitute declaration of certification attesting to the ownership of the representative powers attached to the Trasportation Contract .

  • 06. Attachment D

    Facsimile of the declaration of ownership an Import Contracts in accordance with the provisions of paragraph 1.1.1 of Chapter 5 of the Network Code of Snam Rete Gas..

  • 07. Attachment E

    Facsimile of the substitute declaration of certification useful to communicate the bank details for the correct execution of the Transportation Contract and of the Network Code.

  • 08. Attachment F

    Facsimile of the substitute declaration of certification useful to communicate the absence of any satellite office in Italy.

  • 09. Declaration of the subjects passive-retailers

    Facsimile of the declaration of the subjects passive-retailers .

  • 10. Information questionnaire of Transportation Service Users

    Is the form to be fullfilled and sent with the Transportation Contract. 

     

  • 11. Information with regard to the processing of personal data in accordance with article 13 of legislative decree 196/2003

    It is the information that Snam Rete Gas provides the user about the collection and processing of personal data under Art .13 Leg. 196/2003.

  • 12. Application form for new login credentials to the Capacity Portal

    Facsimile of the qualifications request necessary for accessing to Capacity Portal in case of legal representative replacement.

  • 13. 20% Guarantee confirmation

    Facsimile of the bank guarantee text regarding the confirmation of the capacity commitments to be presented by 19 th August 2015. This guarantee should be worth 20% of the maximum annual confirmed capacity transmission and should be issued by an Italian bank institute or an Italian branch/office of a foreign bank.

  • 14. Company Letter of Guarantee

    This is a facsimile of the letter that the parent company of the tendering party, which holds the credit rating reported in Chapter 5 of the Network Code, must submit to express their commitment to cover the payment obligations in name and on behalf of the tendering party. The amount guaranteed must equal one-third of the total annual consideration for capacity on the National and Regional Networks.

  • 15. 1/3 Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from capacity booking, to be presented within the deadline established by the Network Code. This guarantee should be worth a third of the maximum annual confirmed capacity on the National and Regional Networks.

  • 16. Guarantee 1/3 extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from capacity booking for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 17. 3% Guarantee

    Facsimile of the bank guarantee text regarding the coverage of obligations deriving from the provision of the transport service, to be presented within the deadline established by the Network Code. This guarantee should be worth 3% of the maximum annual capacity on the National and Regional Networks

  • 18. Guarantee 3% extension letter

    This is a facsimile of the letter to extend the validity of the guarantee regarding the coverage of obligations deriving from the provision of the transport service for the next Thermal Year, as provided by the Chapter 8 Paragraph 1 of the Network Code.

  • 19. Late corrections - Notification of succession to another subject

    It is the facsimile of the communication of succession to another subject, in relation to Late Corrections indicated in Chapter 9 Paragraph 4 of the Network Code.

  • Template Anagrafiche

  • Template CESS

  • Template CONP

  • Template CONA

  • Template INCS/INCR

  • Template NATT

  • Template TRAS

  • Conversion factors from Scm to kWh

    These are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    These are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    These are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    These are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    These are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    Are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

  • Conversion factors from Scm to kWh

    Are the factors used by Snam Rete Gas for the conversion of transportation capacity from Scm/d to kWh/h, differentiated for interconnection point and determined using the same GCV used for the definition of the transportation capacity at the beginning of the Thermal Year.

updated
07 March 2024 - 17:40 CET