According to Regulation (EC) no. 715/2009 of the European Parliament and of the Council, Snam Rete Gas on behalf of Infrastrutture Trasporto Gas (hereafter: ITG)  provides for publication of the information related to Chapter 3 of the Annex I. In line with the national legislation on internal balancing rules, ITG is only entitled to carry out the physical operation and to balance the pipeline Cavarzere-Minerbio, whilst Snam Rete Gas is accountable for commercial contract management with transport users including capacity booking, balancing market and tariffs calculations. In terms of these last topics please visit Transparency Template Reg. (EC) 715/2009 - Snam Rete Gas (*)

 

Annex I to Regulation (EC) n. 715/2009

Link

3.1.2 a)
Description

Description of different services and their charges

3.1.2 b)

3.1.2 c)1. 

Description

Different transportation contracts and other significant documents

3.1.2 c)
Description

Network code / standard conditions

3.1.2 c) 2.
Description

Specification of relevant gas quality parameters

3.1.2 c) 3.
Description

Pressure requirements

3.1.2 c) 4.
Description

Procedure in the event of an interruption of interruptible capacity

N/A (no interruptible capacity available)
3.1.2 d)
Description

Harmonised procedures applied when using the transmission system, including the definition of key terms

3.1.2 e)
Description

Provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures

3.1.2 f)
Description

Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator

3.1.2 g)
Description

Rules on balancing and methodology for the calculation of imbalance charges

3.1.2 h)
Description

Flexibility and tolerance levels included in transportation and with additional charges

N/A (*)
3.1.2. i)
Description

Detailed description of the gas system of TSO and its relevant points of interconnection / names of the operators of the interconnected systems or facilities

3.1.2 j)
Description

Rules applicable for connection to the system

3.1.2 k)
Description

Information on emergency mechanisms

3.1.2 l)
Description

Procedures agreed at interconnection points (if relevant) relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing

3.1.2 m)
Description

Description of the methodology and process used to calculate the technical capacity

3.3. (1) f) , g)
Description

Planned and actual interruptions and planned and unscheduled interruptions

3.4 (1)
Description

Information on secondary trading

N/A (*)
3.4 (2)
Description

Harmonised condition for capacity trade

3.4 (5)
Description

Amount of gas in the transmission system and the forecast

N/A (*)
3.4 (6)
Description

Instruments for calculating tariffs

N/A (*)