Login    

Trasportation tariffs

Snam Rete Gas notifies the tariffs for the transportation service of natural gas in force from 1st October 2007 to 30th September 2008.

The tariffs have been calculated according to the criteria established by the Electricity and Gas Authority in Delibera no. 166/05 and have been approved by the Electricity and Gas Authority in Delibera no. 205/07.

The tariffs relate to the use of transportation services on the national gas pipeline network, as defined in Decree MICA no. 18 of 22nd December 2000 (G.U. no. 18 of 23rd January 2001) and its further updating, and on the regional network owned by Snam Rete Gas.

The transportation tariffs envisage the payment of amounts for the committed capacity at the Entry and Exit Points of the national gas pipeline network, of an amount for the committed capacity on the regional network of Snam Rete Gas and a variable amount for the energy associated to the gas delivered at the Entry Points of the national gas pipeline network, excluded the underground storages site's.

The following documents may be downloaded in PDF ("Portable Document Format") for calculating the transportation tariffs:

01. Entrance and Exit Points from the National Pipeline Network
Punti di entrata e di uscita dalla rete nazionale
The document describes the entrance and exit points from the national gas pipeline network together with a map of their location.
02. Transportation Tariff
Transportation Tariff
The document gives a brief description of the transportation tariffs and the table of unit charges approved by the Electricity and Gas Authority for the thermal year 2007/2008 with Delibera n° 205/07.
 
03. Municipalities-Withdrawal Areas Database PDF EXCEL
Data Base Comuni-Aree di Prelievo
The "Municipalities-Withdrawal Areas" Database contains for each withdrawal Area the list of the municipalities aggregated to it. The search is made by selecting the withdrawal Area and then the Province graphically or by name.
icona_pdf exel-ico
04. Data Base Punti di Riconsegna    
Data Base Punti di Riconsegna
The "Redelivery Points" Database contains for each redelivery point the information needed to calculate the transportation tariffs: the withdrawal areas and the distances from the national gas pipeline network. The distance from the national gas pipeline network is calculated for plants related to a distribution network as the average distance of the redelivery points that supplies it, and in all other cases as the real distance from the national gas pipeline network. The search is made by redelivery point.

icona_pdf

  exel-ico

  

Capacity tables PDF XLS
30/07/2008: DB Capacities Pressures Tariff Parameters 30_07_08                                                                                                                  icona_pdf exel-ico
30/06/2008: DB Capacities Pressures Tariff Parameters 30_06_08 icona_pdf exel-ico
31/05/2008: DB Capacities Pressures Tariff Parameters 31_05_08 icona_pdf exel-ico
30/04/2008: DB Capacities Pressures Tariff Parameters 30_04_08 icona_pdf exel-ico
31/03/2008: DB Capacities Pressures Tariff Parameters 31_03_08 icona_pdf exel-ico
29/02/2008: DB Capacities Pressures Tariff Parameters 29_02_08 icona_pdf exel-ico
31/01/2008: DB Capacities Pressures Tariff Parameters 31_01_08 icona_pdf exel-ico
31/12/2007: DB Capacities Pressures Tariff Parameters 31_12_07 icona_pdf exel-ico
30/11/2007: DB Capacities Pressures Tariff Parameters 30_11_07 icona_pdf exel-ico
31/10/2007: DB Capacities Pressures Tariff Parameters 31_10_07 icona_pdf exel-ico
30/09/2007: DB Capacities Pressures Tariff Parameters 30_09_07 icona_pdf exel-ico
31/08/2007: DB Capacities Pressures Tariff Parameters 31_08_07 icona_pdf exel-ico  
 

Modello di calcolo del costo di trasporto

Model of calculation developed from Snam Rete Gas allows to the interested subjects to calculate the transport charge on the base of the tariffs approved of from AEEG deliberates 171/06 for thermal year 2006/07 and of the tariff parameters it publishes and available on the business date base.