Login    

Transportation capacity

In accordance with the Network Code, transportation capacities at the Entry Points and at the Exit Points interconnected with the foreign pipelines for the Thermal Year 2016/2017 are published in January 2016, whereas transportation capacities of the remaining points are published in July 2016.

This section contains Transportation Capacities, Booked Capacities and Available Capacities during the Thermal Year 2016/2017 on the National and Regional Gas Pipeline Networks run by Snam Rete Gas:

  • at the Entry Points of the National Gas Pipeline Network (Entry Points interconnected with foreign pipelines, Entry Points interconnected with LNG terminals, Storages and National Productions);
  • at the Exit Points of the National Gas Pipeline Network (Exit Points interconnected with foreign pipelines, Exit Points to Storages and Off-take Areas);
  • at the Redelivery Points of the Regional Network. 

Specific characteristic about transportation capacities of all kind of network's points are included in the note .

  • Operators of interconnected gas transport systems at the Entry/Exit Points interconnected with foreign pipelines, storages system and Entry Points interconnected with LNG terminals

Page Alert
updated
17 October 2017 - 15:36 CEST